LUFYOEverything. Everywhere.
SAMPLE REPORT · FICTIONAL SITE

BUSINESS PHONES & CONNECTIVITY

Copper Off?
Here’s your plan.

VoIP readiness and site assessment

Example Works Ltd · Single-floor office · 12 users
Reference: LUF-SAMPLE-001 · Example edition, November 2026

01 / Your site at a glance

Ready to move, once three issues are addressed.

The example connection has capacity for the expected calls. Priorities are to protect phone power, give voice traffic the right network treatment and confirm the alarm’s migration requirements.

Illustrative findings only. This is a fictional example of the report format. No site was visited, no measurements were taken and no number transfer or equipment compatibility has been confirmed. A real report records the test method, equipment, conditions and limitations.

02 / Phones and number retention

Your numbers

One main business number and two additional numbers identified in the example inventory.

ACTION: Confirm transfer eligibility

Obtain the number list and account details, check transfer requirements and agree the sequence before cancelling any existing service.

Your call setup

12 users; planning assumption of four simultaneous external calls. Reception, a main menu and an out-of-hours message required.

ACTION: Confirm the call plan

Check handset reuse, user requirements, call routing and mobile or desktop calling before selecting the system.

03 / Connection and voice tests

Example results show how the evidence would be presented. Acceptance criteria are agreed for the selected voice service and expected use.

CheckIllustrative resultWhat it means / next action
Connection throughput92 Mbps down / 18 Mbps upAssess alongside busy-hour usage and required concurrent calls.
Round-trip delay32 ms to the test endpointRecord endpoint and route; repeat during a representative busy period.
Variation in delay4 ms during the sample testRepeat under load to check consistency.
Packet loss0% during a 10-minute sampleA short test does not establish long-term reliability.
Calls during network loadBrief audio breakup in this exampleReview traffic management and repeat controlled call tests.

A real report includes wired test location, date and time, test equipment, endpoint, duration, load conditions and observed call behaviour. Speed alone does not establish VoIP readiness.

04 / Power, outages and connected equipment

Keep the business reachable

Example finding: router and phone switch have no battery backup. An internet or power outage could interrupt desk phones.

Next step: agree backup runtime, assess a secondary connection and configure an alternative call destination.

Check what else uses the line

Example inventory: one alarm connection requires specialist confirmation. Door entry and payment equipment also need checking where present.

Next step: confirm compatibility and emergency-calling arrangements, including the registered site address, before migration.

05 / Wi-Fi and supporting network

Voice is the priority. Wireless and network checks establish whether the equipment supporting those calls is suitable.

AreaExample findingRecommendation
Wired phonesSwitch power capacity not documentedVerify available power for all planned handsets.
Wi-Fi callingAudio interruption reported between roomsTest coverage and roaming with the intended calling devices.
Shared networkVoice shares capacity with large file uploadsAssess traffic management and retest at expected load.
Detailed Wi-Fi surveys: heatmaps, interference analysis and access-point design are separate deliverables when included in the agreed scope. This sample does not represent a specialist wireless survey.

06 / Your action plan

  1. Confirm the essentials. Numbers, users, call handling, connected equipment and emergency-calling requirements.
  2. Prepare the site. Resolve network traffic issues and agree suitable power and internet backup.
  3. Prove the setup. Pilot the selected phones, check real calls under load and record the results.
  4. Move with a plan. Agree the transfer date, responsibilities, interruption expectations and contingency arrangements.
  5. Check after the move. Verify incoming and outgoing calls, routing and agreed features; document any remaining actions.

07 / Scope and next steps

Your actual report will distinguish measured results, information supplied by your team and items still awaiting confirmation. It will set out the recommended work and any further testing required.

Equipment, installation, subscriptions and specialist surveys are separately scoped and priced. An audit does not place an order, transfer a number or change an existing service.

Keep your number. We’ll sort the rest.
Number transfer remains subject to checks and acceptance.